SUMMARY Lead and administer the planning staff within the workcell, supports the development and implementation of planning strategies and systems and optimizes costs under supervision of the Planning Manager.
- Provide feedback and support development of Planning initiatives and strategies. Ensure workcell's execution to Planning strategies.
- Support customer's business needs using standard process where possible and customized solutions where necessary.
- Ensure that the Workcell is focused to drive down the overall cost of materials. Ensure 100% on-time delivery.
- Establish build readiness. Maintain efficiency of capacity and customer sizing.
- Maintain accurate revenue forecasting.
- Maintain material control and liability.
- Develop Master Production Schedule (MPS) and load into Jabil's ERP system, including Purchase Order (PO) coverage. ·
- Ensure the MPS is always 100% accurate and achievable.
- Achieve and maintain 95% MPS goal.
- Own production planning, BOM and document control with or without additional support.
- Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
- Maintain the workcell's capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
- Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
- Maintain the customers latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
- Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
- End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy.
- Own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs. ·