Search by job, company or skills

Project Manager Electric Train

Project Manager Electric Train

smh rail group
Fresher
Not Disclosed
  • Posted 21 hours ago
  • Be among the first 10 applicants

Job Description

The Project Manager shall be responsible for the overall planning, execution, coordination, monitoring and successful delivery of the Electric Train Level 3 Maintenance, Repair and Overhaul (MRO) project within the contractual period of 36 months.

The incumbent shall lead a multidisciplinary team comprising engineering, production, procurement, logistics, quality assurance, testing and commissioning, finance and safety personnel to ensure that all project deliverables comply with client Statement of Needs, OEM maintenance manuals, applicable international railway standards and operational requirements.

The Project Manager shall be accountable for project profitability, timely delivery, technical compliance, resource optimisation, risk management and customer satisfaction.

Key Roles and ResponsibilitiesProject Planning and Execution
  • Develop and implement a comprehensive Project Execution Plan (PEP).
  • Prepare a detailed 36-month master project schedule using Primavera P6 or Microsoft Project.
  • Establish the Work Breakdown Structure (WBS), project milestones and critical path.
  • Develop individual trainset overhaul and delivery schedules.
  • Ensure adequate manpower, materials, tooling, machinery and infrastructure readiness before trainset handover.
  • Monitor daily, weekly and monthly project progress.
  • Implement recovery plans to mitigate delays and achieve contractual delivery milestones.

Technical and Engineering Management

Oversee all engineering, maintenance and overhaul activities across the seven major rolling stock subsystems.

1. Bogie System

Bogie frames, wheelsets, axle bearings, suspension, traction motors, gearboxes and brake assemblies.

2. Coupler System

Semi-automatic and semi-permanent couplers, mechanical connections and damping systems.

3. Air Supply and Brake System

Compressors, air dryers, pneumatic equipment, brake controls and associated safety systems.

4. Propulsion System

Traction converters, high-voltage equipment and propulsion control systems.

5. Auxiliary System

Auxiliary power supply, HVAC and associated electrical equipment.

6. Automatic Train Protection (ATP)

Train protection equipment, sensors and safety-critical control systems.

7. Interior and Exterior

Passenger saloons, driver's cab, doors, toilets, gangways and carbody refurbishment.

Ensure all engineering activities are performed in accordance with approved maintenance procedures, technical specifications, OEM requirements and applicable international standards.

Production and Workshop Management
  • Manage the complete overhaul process from trainset receipt to final handover.
  • Coordinate dismantling, cleaning, inspection, repair, overhaul, renewal and reassembly activities.
  • Establish production targets for each workshop and subsystem.
  • Ensure effective utilisation of manpower, machinery, equipment and workshop facilities.
  • Coordinate specialised subcontracted overhaul activities.
  • Monitor productivity, workmanship and production efficiency.
  • Implement Lean Manufacturing and continuous improvement initiatives where appropriate.
  • Ensure all trainsets are completed within the approved turnaround time.
Procurement and Supply Chain Management
  • Coordinate with the Business Services and Procurement Department to establish a comprehensive project procurement plan.
  • Review and validate the Bill of Materials (BOM) for each trainset.
  • Ensure timely procurement of genuine OEM spare parts and components.
  • Identify critical and long-lead-time materials during project mobilisation.
  • Monitor purchase order status, supplier performance and material delivery schedules.
  • Coordinate OEM technical support arrangements for a minimum of 60 months.
  • Manage component obsolescence and approved Equivalent Equipment Manufacturer (EEM) proposals.
  • Ensure material traceability, certification and compliance with technical specifications.
  • Minimise production interruptions arising from material shortages.
  • Monitor procurement expenditure against the approved project budget.
Financial and Commercial Management
  • Take overall accountability for the approved project budget and profitability.
  • Develop project cash flow forecasts in coordination with the Finance Department.
  • Monitor actual expenditure against budgeted costs.
  • Manage material, manpower, subcontracting, logistics and overhead costs.
  • Prepare monthly project financial performance reports.
  • Monitor committed costs, outstanding liabilities and cost-to-complete forecasts.
  • Coordinate progress claims, milestone billing and payment certification.
  • Manage contractual variations and additional work claims.
  • Implement cost-saving initiatives without compromising quality or contractual compliance.
Corrective Maintenance Management
  • Manage the contractual 10% corrective maintenance allocation for each main subsystem.
  • Identify unforeseen defects and additional rectification requirements.
  • Ensure preparation of Corrective Maintenance Reports (CMR).
  • Review root cause analysis, technical justification and proposed rectification methods.
  • Obtain clients written approval before commencing corrective maintenance activities.
  • Monitor corrective maintenance expenditure against approved allocations.
  • Ensure that corrective maintenance works are not duplicated with the original contractual scope.
Quality Assurance and Technical Compliance
  • Establish and implement the Project Quality Plan (PQP).
  • Ensure compliance with clients Statement of Needs and OEM maintenance manuals.
  • Coordinate Inspection and Test Plans (ITP).
  • Ensure timely submission of Requests for Inspection (RFI).
  • Coordinate Non-Destructive Testing (NDT), dimensional inspections and component performance testing.
  • Ensure calibration and certification of all relevant tools and testing equipment.
  • Coordinate with the Independent Checking Engineer (ICE), OEM representatives and client inspectors, as applicable.
  • Monitor Non-Conformance Reports (NCR) and corrective actions.
  • Ensure compliance with applicable EN, UIC, ISO, BS, DIN, JIS and Malaysian standards.
  • Maintain complete quality records and component traceability.
Testing and Commissioning

The Project Manager shall coordinate all testing and commissioning activities, including component testing, Factory Acceptance Testing (FAT), First Article Inspection (FAI), static testing, dynamic testing and mainline performance validation.

More Info

Job Type:
Industry:
Employment Type:

Key Skills

Corrective Maintenance Reports (CMR)

Non-Destructive Testing (NDT)

Inspection and Test Plans (ITP)

About Company