Lead the design and review of highway drainage systems including roadside drains, culverts, cross-drainage structures, detention ponds, attenuation systems, and river protection works.
Perform and review hydrological and hydraulic analyses for minor and major drainage systems.
Ensure compliance with JKR Arahan Teknik, MSMA, DID guidelines, and local authority requirements.
Prepare and review drainage reports, calculations, drawings, and technical specifications.
Lead technical submissions and coordinate approvals with DID, JKR, and local authorities.
Coordinate drainage design with road geometry, pavements, structures, geotechnical works, utilities, and environmental requirements.
Develop flood mitigation strategies and climate-resilient drainage solutions.
Provide technical support during procurement and construction stages.