Search Jobs

Search by job, company or skills

Physical Design Engineer

Physical Design Engineer

HCL TechBee
  • Posted 12 hours ago
  • Be among the first 10 applicants

Job Description

Perform end to end physical design flow:

o Floorplanning

o Power planning (PG grid, IR)

o Placement & optimization

o CTS (Clock Tree Synthesis)

o Routing

o Post route optimization

• Achieve timing closure across all modes and corners

• Resolve DRC, LVS, ERC and signoff violations

• Handle low power design techniques:

o Multi Vt, Multi voltage (UPF)

o Power gating, clock gating

• Perform physical verification and signoff:

o STA (Primetime)

o SI / Crosstalk

o IR drop & EM analysis

• Work on advanced nodes (7nm, 5nm, 3nm or below)

• Collaborate with:

o RTL & Micro architecture teams

o DFT & Test engineers

o Foundry and CAD teams

• Debug complex timing, congestion, power, and variability issues

• Drive methodology improvements and automation (scripts/flows)

More Info

Key Skills

IR drop

Post route optimization

Clock gating

Crosstalk

Low power design techniques

Power gating

EM analysis

UPF

DRC

Multi Vt

Multi voltage

Placement optimization

About Company

Similar Jobs

2-4 yrs
Malaysia, Penang
Skills:
TclPythonPerlroutingInnovusTiming ConstraintsLVSCTSStaICC2Physical DesignprimetimeTempusMCMM analysisDRCPNRSDC
Malaysia, Penang
Skills:
routingplace-and-routetiming and SDC constraint generationfloorplanninglow-power design methodologiesPhysical Verificationrepeater insertionchip-level floorplanningfeedthrough topology planningTiming Closuretop-level port pin assignmentpower-aware synthesisPlacement
2-5 yrs
Penang, Malaysia
Skills:
UnixpythonperlLinuxTclCalibreBack-End physical design EDA toolslarge scale ASIC chip physical designdeep submicron ASIC design flowFusion Primetime
2-8 yrs
Malaysia, Penang
Skills:
TclPythonEMprimetimeSiSDC constraintsIrInnovusStaICC2
Malaysia, Penang
Skills:
Cadence InnovusSTA conceptsSynopsys ICC2Timing ClosurePhysical DesignLogic synthesis conceptsPhysical Design signoff requirementsPlace Route